Data Centre, Holland

Project Overview

Design and build package to carry out the internal fit out of a datacentre and associated offices in Holland.

Charles Edward provided an onsite management and operational team in Holland to ensure the smooth operation of this 3 month long package of works to enable a data centre in the North of Holland.

Scope of Works

  • Design and build temporary slave raised access flooring system
  • Installation of the permanent heavy duty raised access flooring to the datacentre
  • Construction of internal partitions
  • Installation of suspended ceilings
  • Plastering to walls and ceilings
  • Painting and decorating
  • Interior fit out including tacky mats, cabinets & internal glazed screens
  • Kitchen installations
  • Ceramic wall and floor tiling
  • Vinyl flooring installation
  • Mastic works
  • Builder’s clean